by pag_18_w | Sep 11, 2018 | News
SAS now offer installation of free standing edge protection systems.
by pag_18_w | Aug 23, 2018 | Contract
Lorem ipsum dolor sit amet,sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, At vero eos et accusam et justo duo dolores et ea rebum. Lorem ipsum dolor sit amet, no sea takimata sanctus est Lorem ipsum dolor sit amet. Stet clita kasd...
by pag_18_w | Aug 23, 2018 | Contract
SCAS were challenged to provide and erect temporary step access to the steelwork roof area for roofers and provide a full treble handrail round the perimeter of the buildings frame. All new build block work & stonework is constructed from our scaffolding. We...
by pag_18_w | Aug 23, 2018 | Contract
Scaffolding had to be erected within the roof lights over glass paneling to give access for a new electric blind system to be installed into the art gallery. Scaffold protection was then installed underneath glass roof lights to stop any falling debris. All scaffold...
by pag_18_w | Aug 23, 2018 | Contract
This client was an Insurance company based in West Yorkshire. The building was due to undergo a full re-roofing and required a temporary scaffold to be erected around the full perimeter, as well as the supply of a hoist system. Scaffolding Access Solutions provided...